MacLeod Consulting, Inc.

structural engineering for architects and building owners

Gus Canty Center

Up Services Resume

Memorial Bell Tower
Rochester Police Station
Gus Canty Center
Lawson Tower
Memorial Building
St. Mary Church
Old Cambridge Baptist Church
Memorial Hall
United First Parish Church

Town of Falmouth adds wing to recreational center

August 6, 2003  The Galante Architecture Studio has just completed bid drawings and specifications for the town of Falmouth for a10,000 square foot addition to the Gus Canty Center, their recreational facility. The Town intends to use this building to house a new Teen Center, Game Room, Computer Center, and Fitness Center along with lockers and equipment storage. The design calls for the interior steel framing to openly show through glazed partitions along with wood and concrete paneling to integrate the framing and finish materials as a single aesthetic. The Town is now advertising for construction bids. Learn more about this architect at  www.galantearchitecture.com

 

An article in  the August 6, 2003 edition of Architecture Magazine features this project as an innovative design succeeding at achieving excellent design while constrained by a tight budget. 

Below are thumbnail photographs of the finished recreation center. Double-click on a thumbnail to open a window showing the enlarged picture. Close the window to return browsing this page.

Gus Canty Ramp Elevation.jpeg (43769 bytes)Gus Canty Ramp Entry.jpeg (23477 bytes)Gus Canty Corner Window.jpeg (19045 bytes)Gus Canty gymnasium.jpeg (44105 bytes)Gus Canty Corridor.jpeg (34843 bytes)Gus CAnty lockers.jpeg (26004 bytes)

The New England Chapter of the American Institute of Architects awarded MacLeod Consulting a Citation for Design Innovation on this project. 

Canty Award.jpg (129672 bytes)

Drawings:  The links below will launch your Adobe Reader. Selecting the underlined drawing number of the desired plan will open the drawing in a new web page. When finished viewing the drawing close its page to return to the host page. Most computers have the Adobe Reader already installed. If the Reader does not start, you may have to download and install the latest reader from www.adobe.com

 

GUS CANTY CENTER DRAWINGS
SK-0General Notes
SK-1Foundation Plan
SK-2First Floor Framing Plan
SK-3Roof Framing Plan

For More Information Contact:

MacLeod Consulting, Inc.
29 Woods Road
Belmont, MA 02478-3805

Tel: 617-484-4733
FAX: